THE NEW LIBRARY

A Library and a Computer Technology Lab
Total Cost $194,800.00
1. Library In phase two, School News Nationwide and its partners proposed to build a library at the Bethel Town School to accommodate 100,000.00 books.
To date, we have collected 7,000 books for the new library.
First floor, will be the library
76 ft X 109 ft X 24 ft
Cost include material and labor $97,400.00
General Steel, an American Colorado based construction and engineering firm, designed this library and Technology Lab. This modern building will be able to withstand dangerous winds, hurricane and storms, traveling at 155 miles per hour.
2. Computer Technology Lab
We will build a computer technology lab with classrooms to accomidate147 computers
Second floor-story building
76ft x 109 ft x 24 ft
Cost include material and labor $97,400.00
|
This
site requires the latest browsers, Mozilla Firefox 2.x, get it here If you don't have the Flash plugin, get it here
>>
Copyright/Trademark
Notice:
All text, visual, audio, and graphic material contained herein is
proprietary. Any unauthorized use or reproduction thereof subjects
the user to significant civil and/or criminal penalties under Title
17 of the United States Code, the Berne Convention and corresponding
individual national statutory schemes. All rights reserved, including
the right of reproduction in whole, in part, or in any form without
the express written consent of the company.
|